Installing Windows and Doors


X Factor Construction Reaches the Summit


Unit Two Master Suite Framing Underway


Unit Two Main Floor Rough In Framing Underway




Unit Two Lower Level Walls Formed and Poured


Unit Two Footings Poured

10# reinforced concrete footings.


Unit Two Site Excavation

Unit Two Site Excavation. Dolomite gravel layered in preparation for concrete slab. Structural steel arriving on site in the next ten days.