10# reinforced concrete footings.
October 5, 2021 at 12:51 am in Updates
September 25, 2021 at 8:13 am in Updates
September 2, 2021 at 4:50 pm in Updates
August 27, 2021 at 12:39 pm in Updates
August 6, 2021 at 8:17 am in Updates
Unit Two Site Excavation. Dolomite gravel layered in preparation for concrete slab. Structural steel arriving on site in the next ten days.
July 21, 2021 at 7:54 am in Updates
Unit Two site excavation. Dolomite gravel bed laid in preparation for concrete slab.
July 10, 2021 at 11:09 am in Updates
Much has been accomplished over the winter and spring with demolition, engineering, permitting and planning. Utility and infrastructure work got underway in June. Construction of the first residence on Unit Two commenced in July. Check back often to watch our progress. Three to Four Bedroom Residence Under Construction on Unit Two Unit Number Two Site Excavation – July 9, 2021